92
Commissioning
WAGO-I/O-SYSTEM 750
753-668/000-004 4FAI 0/4-20 mA Diff PROFIsafe
Manual
Version 1.0.0, valid from HW/SW Version 01/01
The date of manufacture (calendar week/year) marks the beginning of the proof
test interval.
The proof test interval is specified in the technical data of the respective F
I/O module.
At the end of the proof test interval, the usage duration of the F I/O module is
also reached. The F I/O module must then be replaced. An explicit proof test is
not provided.
8.1.2
Adding or Replacing Components
Check safety functions!
If F I/O modules are added to a fieldbus node (see section “Mounting” > ... >
“Inserting and Removing Devices”) or replaced (see section “Service” > ... >
“Replacing an F I/O Module”), the associated safety function should undergo
additional testing before commissioning the machine or system.
8.2
Setting the PROFIsafe Address
The PROFIsafe address can be set by the coding switch of the F I/O module or
by the WAGO parameterization tool.
The PROFIsafe address set on the coding switch of the F I/O module has priority
over the PROFIsafe address set by the WAGO parameterization tool.
Only when the address set on the coding switch equals 0 does the setting of the
PROFIsafe address using the WAGO parameterization tool take effect.
Default status address setting
In the default status, the address setting by the coding switch is active.