2.3 Operation
After system wiring and installation, it is possible to start the system according to the
sequence shown in figure 2.6.
Action
Effect
•
Connect 230Vac single phase
•
Digital and diagnostics circuits
power supply (or 110Vac
are fed
optional)
- Green LED on DBM PS, AUX PWR = ON
- Opto output MOTOR OK is enabled
•
Connect 230Vac three phase
•
300V Bus Bars are fed
power supply
- Yellow LED on DBM PS, PWR BUS = ON
- Green LED on DBM, POWER OK = ON
•
Reset protections by pushing
•
Possible faults are reset
the RESET button on front
- After 3s the opto output DRIVE OK is enabled
panel or by sending a 20ms
pulse to REM RESET opto input
•
Enable analog Drive Enable
•
Green LEDs on DBM, DRIVE EN = ON
for each axis and Reference
and REF EN = ON
Enable via positive logic
WARNING: HIGH VOLTAGE - DISCHARGE TIME APPROX. 6 MINUTES.