MNL000445.doc
Revision 00
09/19/2016
© Versum Materials, Inc. as of the revision and date shown. All rights reserved.
Confidential and Proprietary Data
Page
-
13
VERSUM MATERIALS, INC. APx DISTRIBUTION SYSTEM FIELD START-UP
CHECKLIST
page 7 of 8
FUNCTIONAL TEST - FILE VERIFICATION
Check off line item when completed
Sign and date when section is completed
Branch 1-4 (A-D)
Branch 5-8 (E-H)
Verify purge parameters per software
documentation
Verify alarm conditions per software
documentation
Verify VERSUM MATERIALS, INC. set points per
Distribution system cleaned inside and out
Suggested Customer Signoff
( Optional)
Date
Signature
Section: Required / Not required ( Circle one )
Exhaust signed off
Electrical Signed off
Safety signed off
Environmental documentation submitted
Plumbing signed off
Environmental sign off
SECTION COMPLETED SIGNATURE
DATE