1.
Touch anywhere on the graphics portion of the screen and enter the password.
2.
Using the dropdown menu on the Main Menu
screen, highlight the Line you want to operate.
3.
From the Main Menu, select "START ROUGH
LINE".
4.
Went prompted by the Confirm Sequence Start
Window, hit “CONFIRM”.
5.
“ROUGH LINE" will appear in the appropriate Line
status box at the top of the screen.
6.
Follow prompted manual steps on the screen.
7.
The controller will make several checks for adequate
purge pressure and vacuum and proper closure of the
manual process isolation valve for the Line. Any
fault will stop the process and alarm.
8.
The controller will initiate a sequence of evacuation
and pressurization steps until the configured number of cycles are completed.