MNL000447.doc
Revision 0 0
09/19/2016
© Versum Materials, Inc. as of the revision and date shown. All rights reserved.
Confidential and Proprietary Data
Page
- 12
All manual valves on the Line purge inlets
(MV4-1, MV4-2, MV4-3, MV4-4) and vent
outlets (MV6-1, MV6-2, MV6-3, MV6-4)
should be closed during process flow and
idle modes. The specific valves should be
opened only during purging cycles and
manual mode operations.
16.
At the end of the purge cycle, the Line status box at the top of the screen will
indicate "ROUGH LINE COMPLETE."
17.
Verify the process gas source is on-line and set at the desired delivery
pressure, PT1 (process gas inlet maximum 90 PSIG.)
18.
Ensure MV1, process gas inlet manual valve, is open.
19.
Touch anywhere on the graphics portion of the screen and enter the password.
20.
Select the same Line from the Main Menu that the purge was performed in Step
12.
Before proceeding further, verify that
process equipment and facility piping is
ready to receive process gas.