VERSUM MATERIALS, INC. APx DISTRIBUTION SYSTEM FIELD START-UP CHECKLIST
page
1 of 8
CUSTOMER
System #
SERIAL #
DEVICE DESCRIPTION
MODEL#
GAS TYPE
START DATE
FINISH DATE
TOOL NAME
TECH REP
CUSTOMER SYSTEM LABEL
VISUAL INSPECTION
PIPING/MECHANICAL
Check off line item when completed
Sign and date when section completed
Branch 1-4 (A-D)
Branch 5-8 (E-H)
Perform visual inspection to verify all mechanical and
electrical connections have been made.
Distribution System labeled correctly per Specification
Sheet.
No nylon collars stripped
Distribution System information received: ( circle )
Specification Sheet, Flow Schematic,
Customer I/O Drawing,
Inspection and Test Sheet (leak test and certification),
Quality Inspection and Test Sheet (functional test),
Installation and Operation Manual.
All open connections sealed
General appearance satisfactory
Verify leak test from gas bottle to P.O.U. complete
Verify corrosive or toxic scrubber and incinerator
operational and running
Pitot tube installed with correct 90
°
orientation
Tel tails installed
Verify exhaust line functioning
Panel under pressure 20 psig > < 25 psig
(1.4 barg
≥ ≤
1.7 barg)
Correct venturi pressure present min. 75 psig
(5.2 barg)
Correct pneumatic pressure present 85 - 95 psig max.
(5.9 - 6.6 barg)