MNL000445.doc
Revision 00
09/19/2016
© Versum Materials, Inc. as of the revision and date shown. All rights reserved.
Confidential and Proprietary Data
Page
-
3
11.
Pneumatic supply connected to controller and 85-95 psig max.
(5.9-6.6 barg) of nitrogen available (see Section 3.6).
12.
Distribution system internal piping helium leak tested (see
Section 5).
13. Purge cylinder available, if required.
14. Hazardous gas monitor installed and operating.
Inspection Sign‐Offs
Electrical
Mechanical
Quality
Safety
VERSUM MATERIALS, INC. (Field Start-Up Checklist Complete)