MNL000445.doc
Revision 00
09/19/2016
© Versum Materials, Inc. as of the revision and date shown. All rights reserved.
Confidential and Proprietary Data
Page
-
12
VERSUM MATERIALS, INC. APx DISTRIBUTION SYSTEM FIELD START-UP CHECKLIST
page 6 of 8
FUNCTIONAL TEST-USER SET POINTS
Check off line item when completed
Sign and date when section is completed
Branch 1-4 (A-D)
Branch 5-8 (E-H)
User Alarm set points listed and verified
List changes in this
column
Alarm #
Label
Setpoint
SECTION COMPLETED SIGNATURE
DATE
FUNCTIONAL TEST- PROGRAM MODES
Check off line item when completed
Sign and date when section is completed
Distribution System Programs
Branch 1-4 (A-D)
Branch 5-8 (E-H)
Process gas flow
Stick purge
Rough line evacuation
Manual mode
SECTION COMPLETED SIGNATURE
DATE
Notes: