Section 6: Distribution System
Functional Checklist
Note: Throughout this section, the term APx refers
to the GASGUARD AP series of controllers.
Example: GASGUARD AP10 Controller
After all connections have been made and installation of the distribution system is
complete, the appropriate Versum Materials, Inc. Representative should be
contacted to schedule the final on-site functional check. This functional check
must be made prior to start-up. The functional check is an additional service
provided for a cost. The cost of this service may have been
pre-arranged
during
the sale and scope review of the project. Contact your Versum Materials, Inc.
Representative to discuss this. The Versum Materials, Inc. Technical
Representative and/or Megasys
®
Technician will ensure that all the mechanical and
electrical components in the distribution system are functioning properly and all
programmed sequences are operational.
A copy of the completed distribution system functional checklist should be
supplied to Versum Materials, Inc. for placement into the distribution system
maintenance file. The Distribution System Utility Checklist is found on the
following two pages.