Once the module is moved to near its final location, remove the
walls and roof of the box.
Inspect the equipment for shipping damage.
The outside of the equipment cabinet should be checked for scratches, dents, or
damaged external piping.
The door of the module should be opened and the piping system should be carefully
inspected for damage.
The front door of the AP11 controller and eV ECC should be opened to check for
damaged electrical components.
NOTE:
Any damage observed on the equipment must be immediately reported to the
shipping company and to the Versum Materials, Inc. factory.
2.
Using a forklift, lift the equipment off the crate and carefully set it on the floor.
3.
Move the unit to its final location.
3.0
Module Installation
All equipment must be installed in accordance with the following drawings and codes.
BSGS eV / BULKGUARD eV module drawings included in Appendix A – Installation Drawing
Package.
Seismic Codes per ASME, UBC, or applicable local codes.
NOTE: It is the responsibility of the owner to ensure that all equipment modules are
mounted in accordance with all applicable civil and seismic codes.
Additional considerations and notes:
1.
BSGS eV / BULKGUARD eV modules and source containers (Y containers, Drums, Trailers,
etc.) must be sited per Code requirements and Versum Materials, Inc. criteria away from fire
and combustible sources. Contact your Versum Materials, Inc. representative for assistance
with siting criteria.