Chapter 8 - Operating Procedures
_______________________________________________________________________________________________________________
MNL000536
Revision 1
03/26/2018
BSGS eV / BULKGUARD eV
© Versum Materials, Inc. as of the revision and date shown. All rights reserved.
Confidential and Proprietary Data
Page
8
-
34
3.
Main Menu screen will be displayed. Use
the
and
keys or the drop
down menu to select the correct source line.
The following instructions are for Conditioning
sequence source A, but the same procedure
applies to source B.
4.
Press the START CONDITION pushbutton.
5.
The Confirm Sequence Start window will be
displayed. Press the CONFIRM pushbutton.
6.
!!Operator Prompt!!
OPTIONAL if source is automated (Y or
ISO), install the pneumatic line and unlock
the automated valve.
The prompt on your controller may be
different, depending on your source container
valve configuration. Each program is written
to match the source container that will be
connected to the module.
7.
!!Operator Prompt!!
A prompt will appear on the display to
“Open Manual Valve MV-1xy” if deep purge
and “Open Manual Valve MV-2xy” if cross
purge. After opening valve, acknowledge
prompt by pressing the “OK” key.