Safety
Software Power-up
32
Dimension 3100 Manual
Rev. D
2.7.2 Power-up Checklist (Normal Usage)
Power-up (Normal Usage)
_______
1.
Verify that all system components are plugged into AC power with the correct voltage.
_______
2.
Verify that all moving parts are free of obstructions.
_______
3.
Verify that all cables are connected properly.
_______
4.
Verify that the computer, controllers, and monitors turn on simultaneously.
2.8
Software Power-up
2.8.1 Log into Windows NT
1. Press
CTRL
-
ALT
-
DELETE
to log into Windows NT (see
).
Note:
The screen begins with the panel split across both screens.
2. Drag the panel to one screen for use (see
CAUTION:
At this time, all pre power-up and power-up instructions must be
completed before continuing.
ATTENTION:
A ce moment, toutes les étapes avant la mise en tension et de mise
en tension doivent être effectuées avant de continuer.
VORSICHT:
An dieser Stelle müssen die „Pre Power-up” und „Power-up”
Checklisten komplett sein, bevor Sie fortfahren.
Содержание Dimension 3100
Страница 12: ...xii Dimension 3100 Manual Rev D ...
Страница 20: ...List of Figures xx Dimension 3100 Manual Rev D ...
Страница 72: ......
Страница 106: ......
Страница 118: ......
Страница 214: ...Scanning Tunneling Microscopy STM Etching Tungsten Tips 194 Dimension 3100 Manual Rev D ...
Страница 222: ......
Страница 266: ......
Страница 274: ......