03-914642-00:6
7-1
7 Maintenance
This section describes maintenance procedures for the Archon, including how to
change the soil and water probes and soil transfer line.
WA R N IN G :
S H O C K H A ZA R D
Service to the Archon should only be performed by qualified
service personnel. Before any service is performed, turn the
instrument OFF and remove the main power cord. Allow
sufficient time for all heated zones to cool before
proceeding.
When cleaning any components of the Archon, e.g., exterior, robotic slide rods or
leadscrews, gripper arms or sample tray, use only an isopropanol and water
solution placed on a lint-free and oil-free cloth.
7.1
Removal and Replacement of the Needle Sparge or SoilVial Probe
WA R N IN G :
B U R N H A ZA R D
The cover and probe are hot.
(Refer to
Figure 7-1
,
Figure 7-2
, and
Figure 7-3
.)
Removal
1. Loosen the #4-40 socket head screw securing the cover (1). Remove the
cover.
Figure 7-1
1 Cover
Содержание archon
Страница 43: ...4 6 ...
Страница 73: ...6 18 ...
Страница 103: ...9 4 ...
Страница 117: ...11 10 11 6 Interconnect Diagram Note F R L R and U D P O T should be set at 3 4 std valve full power ...
Страница 119: ...12 2 ...