8-4
8.3
Archon to Tekmar LSC 2000/3000 with Varian 3400/3600
P/N DY-505868-00
R ed
P 23
P 16
B lack
Pin Outs
Remote I/O
Archon
Color
Tekmar
Function
Color
J23-J16
Varian Motherboard
IN
OUT
Green
24
3
GC Ready
Green
Desorb
Drain
15
2
Brown
23
4
GC Ready
White
3
1
P23
Red
1
21
GC Start
Red
Start
Purge
5
18
White
2
22
GC Start
Black
4
3
P16
Blue
16
21
Start
Red
To
P&T
Ready
14
1
Black
15
22
Start
Black
Data System
Note: The DIP switch UO12 settings in the LSC 2000 must be as follows; 3 OPEN and 4
CLOSED. All others closed. DIP switch UO13 all OPEN.
For a 3000 installation, the Tekmar GC Port must be specified.
1. At the Standby Screen, press the key labeled “CONF.”
2. At the Configuration Screen, press A (GC I/O Port). The GC Port Screen appears.
3. Choose Standard. Press ENTER to save the selection.
4. Turn the instrument off.
The Tekmar 3000 must be programmed to give a switch closure at purge ready. This switch
closure will initiate the Archon to begin the sample Cycle. Select method 14 to provide correct
polarity settings for the purge ready output. If another method is selected please refer to the
Tekmar manual for additional information.
Connect the cable to the Archon and to the purge and trap. Be certain the locking screws
secure the connector to the chassis. The connectors P23 and P16 will connect to the Varian
3400/3600 GC motherboard at connectors J23 and J16. The grounding clamp should be secured
to the GC chassis. Attach red and black wires to the Data System. Refer to your GC and Data
System manuals for correct connector locations.
Note: Make sure to select Aquatek 50.
Female
Male
Содержание archon
Страница 43: ...4 6 ...
Страница 73: ...6 18 ...
Страница 103: ...9 4 ...
Страница 117: ...11 10 11 6 Interconnect Diagram Note F R L R and U D P O T should be set at 3 4 std valve full power ...
Страница 119: ...12 2 ...