Method Setup
03-914642-00:6
5-9
Sequence Step
Purpose
21. Syringe -> waste
The syringe now transfers the water to the waste bottle.
22. Helium ->waste
Helium is flushed through the sample path to the waste
bottle.
23. Flush complete.
Syringe flushing is complete.
24. Return vial
The Robotic Arm verifies the vial position is empty, then
picks up the vial and returns it to the sample tray.
25. Parking
The Robotic Arm goes to rear park.
26. Backflush water probe
The water probe will now be flushed with hot water.
27. Elevator up
The elevator raises the sampling stations.
28. Heating water
Water is heated.
29. Water->water probe
The backflush with hot water now begins.
30. Helium ->water probe
After the water backflush is complete the probe is now
flushed with helium.
31. Elevator down
The elevator moves down.
32. Autodrain
The Archon waste valve opens and helium pressure
from the purge and trap will now drain the sparge tube.
33. Drain sparge tube
The Archon will initiate a safety drain.
34. Sparge tube -> syringe
If any sample water remains in the sparge tube, it is
drawn into the syringe.
35. Syringe -> waste
The syringe transfers the water to the waste bottle.
36. Rinse sparge tube
The sparge tube is rinsed if rinses have been
programmed.
37. Heating water
Water is heated.
38. Water -> lines
Hot water fills the lines.
39. Water -> syringe
Hot water fills the syringe.
40. Syringe -> sparge tube
The syringe transfers the water to the sparge tube.
41. Sparge tube -> syringe
The syringe withdraws the water from the sparge tube.
42. Syringe -> waste
The syringe transfers the water to the waste bottle.
Содержание archon
Страница 43: ...4 6 ...
Страница 73: ...6 18 ...
Страница 103: ...9 4 ...
Страница 117: ...11 10 11 6 Interconnect Diagram Note F R L R and U D P O T should be set at 3 4 std valve full power ...
Страница 119: ...12 2 ...