System Setup
03-914642-00:6
6-13
Standby:
This signal line will verify the status of the Standby signal
received from the concentrator.
Desorb Drain:
This signal line will verify the status of the signal received
from the concentrator to empty the sparge tube during the
concentrator's Desorb step. Most concentrators can send
the signal at either the beginning or the end of the Desorb
step.
Emergency Stop:
This would be an incoming signal to stop the sampling
sequence of the Archon, returning it to the pre start-up
mode. This is a true “stop all” operations function.
Extra:
This is an unused signal line. Possibly for future expansion.
If the selected function is for “Remote Outputs”, the screen will display the
following:
* Remote Outputs *
U/D
L/R
Press Enter to test
This screen allows the relay Output signals to be tested. The line U/D scrolls
through the relay signals. Use the “2” or “8” keys to scroll. The L/R line changes
the status of the relay Output from keep“ open" to “closed” pulse. Use the “4” or
“6” keys to scroll. The ENTER key is used to “pulse” the signal for test purposes.
Injection Mark
Aux. Output
Soil Vial
Start Purge
The Output signals are:
Injection Mark:
This is a test of the “Injection Mark or Start Out” signal. This
could be used to start the concentrator's purge cycle. Each
time the ENTER key is pressed the relay will operate.
Aux. Output:
Provides a test of the output signal for the Auxiliary Output
relay. This signal would occur per the setting for the Auxiliary
Timer.
Soil Vial:
This is a signal test for an output at the point when the upper
soil probe is inserted into the soil vial.
Start Purge:
This is a test of the signal used to start the purge cycle on the
concentrator. The signal will occur after the sample is loaded
into the sparge tube.
Содержание archon
Страница 43: ...4 6 ...
Страница 73: ...6 18 ...
Страница 103: ...9 4 ...
Страница 117: ...11 10 11 6 Interconnect Diagram Note F R L R and U D P O T should be set at 3 4 std valve full power ...
Страница 119: ...12 2 ...