5-14
TM-500 User’s Guide
Preparing to Run a Pre-programmed Job
D292144.8.fm
4.
Return to the
Head Setup Tab
. Press
Move To Place
, then press
Place Part.
Check that the
Blow-off Pressure
is set correctly for the
current part.
The
Blow-off Pressure
Gauge
is located on the left side
of the
Pick Head Bridge
. If components are not dropping
properly, pull the gauge out and rotate to adjust pressure
levels. When the desired pressure level is reached, push
the gauge back in.
Содержание TM-500
Страница 2: ...European Representative QNET BV Hommerterweg 286 6436 AM Amstenrade The Netherlands...
Страница 17: ...Contact Information D292144 2 fm xiv...
Страница 21: ...Table of Contents D292144 3a fm...
Страница 47: ...2 14 TM 500 User s Guide Dual Tray Feeder Input Output Module D292144 5 fm...
Страница 83: ...3 36 TM 500 User s Guide The Setup Screens D292144 6 fm...
Страница 187: ...7 14 TM 500 User s Guide Ethernet Networks D292144 10 fm...
Страница 254: ...751 Summit Avenue Mankato MN 56001 507 387 2039 FAX 507 387 2257 www vtekusa com Email info vtekusa com...