D292144.8.fm
Quick Start: Running a Job
Chapter 5: Operation
5- 3
6.
Set
End of Job
Options.
• Configure
Job Statistics Report/Chart
• Set-up
Autosave
.
• Configure
Bar Code Label
printing.
7.
Setup Inspection
• Open the
2D Tape Tab
on the HMI and turn
In-Tape Inspection
on.
• Configure inspection with the Keyence software as needed.
Note:
To configure vision inspection, see
Chapter 4: Setup
or consult the
Key-
ence User’s Guide
which is provided with the 2D Vision System.
8.
Setup the Pick Head.
• Ensure correct nozzle is installed for part that will be picked.
• Observe vacuum sensor, adjust nozzle pressure as necessary.
9.
Run Job.
• Turn on the Ionizing Fan (optional)
• Close the enclosure doors.
• On the HMI, select the
Run Tab
then press
Run
or
press the
Start
button on the
machine.
• Load/unload parts and reels when prompted.
Caution!
V-TEK® Incorporated takes no responsibility for the safety of TM-500 if it is
used for any purpose other than the intended purpose as specified in this
User’s Guide.
Quick
Start
Содержание TM-500
Страница 2: ...European Representative QNET BV Hommerterweg 286 6436 AM Amstenrade The Netherlands...
Страница 17: ...Contact Information D292144 2 fm xiv...
Страница 21: ...Table of Contents D292144 3a fm...
Страница 47: ...2 14 TM 500 User s Guide Dual Tray Feeder Input Output Module D292144 5 fm...
Страница 83: ...3 36 TM 500 User s Guide The Setup Screens D292144 6 fm...
Страница 187: ...7 14 TM 500 User s Guide Ethernet Networks D292144 10 fm...
Страница 254: ...751 Summit Avenue Mankato MN 56001 507 387 2039 FAX 507 387 2257 www vtekusa com Email info vtekusa com...