D292144.8.fm
Preparing to Run a Pre-programmed Job
Chapter 5: Operation
5- 5
3
.
Setup the
Taper
.
• If placing to the
Taper Mod-
ule
, load the correct carrier
tape and cover tape, adjust-
ing the track width as nec-
essary.
• Select
PSA
or
Heat
seal.
• Align cover tape and sealer
with carrier tape.
• Run a pull test and adjust
seal strength as needed.
• Place an empty reel onto
the take-up reel spindle.
• Use the
Continuous Advance
button on the
Taper Tab
to run out the tape until
it can be attached to the reel. The tape normally can be attached by inserting it
into the reel hub or with adhesive tape.
Caution!
Operators should use caution when working in front of the TM-500. Be
aware of the
Takeup
Arm
and
Carrier Arm
positions to avoid tripping.
Step 1:
Setup
OUTPUT
Содержание TM-500
Страница 2: ...European Representative QNET BV Hommerterweg 286 6436 AM Amstenrade The Netherlands...
Страница 17: ...Contact Information D292144 2 fm xiv...
Страница 21: ...Table of Contents D292144 3a fm...
Страница 47: ...2 14 TM 500 User s Guide Dual Tray Feeder Input Output Module D292144 5 fm...
Страница 83: ...3 36 TM 500 User s Guide The Setup Screens D292144 6 fm...
Страница 187: ...7 14 TM 500 User s Guide Ethernet Networks D292144 10 fm...
Страница 254: ...751 Summit Avenue Mankato MN 56001 507 387 2039 FAX 507 387 2257 www vtekusa com Email info vtekusa com...