D292144.7.fm
Leader/Trailer
Chapter 4: Machine Setup
4- 25
Leader/Trailer
The terms “leader” and “trailer” refer to the lengths of empty carrier tape required at the
beginning (leader) and the end (trailer) of the finished reel of placed parts. Therefore,
when the reel is being taped on the TM-500, the trailer is the first length of empty carrier
tape run before the first part is taped and the leader is the length of empty carrier tape run
after the last part is taped.
1.
Before beginning a production reel, determine how long the trailer and the leader
should be.
2.
To create a
Leader/Trailer
,
open the
HMI and go to the
Taper Setup Tab
.
Under the
Leader/Trailer Settings
, enter
the desired leader length in millimeters.
Note:
If a leader value of zero is
entered, the taper will automatically advance the last
part until it reaches the cut point. If a leader value is
entered, it will move the last placed part that distance
beyond the cut point.
3.
Enter the desired trailer length in millimeters.
Note:
To manually create a trailer, simply select
Continuous Advance
at the beginning of the reel
and run out sealed empty pockets until the desired
trailer length is reached.
4.
Select
Single Reel
or
Multiple Reel
.
Note:
If
Multiple Reel
is selected, a leader and trailer are required. If both leader
and trailer are set at zero, there will be no separation between one reel and the
next.
Step 5:
Setup
Output
LEADER/
TRAILER
Cut Point
Содержание TM-500
Страница 2: ...European Representative QNET BV Hommerterweg 286 6436 AM Amstenrade The Netherlands...
Страница 17: ...Contact Information D292144 2 fm xiv...
Страница 21: ...Table of Contents D292144 3a fm...
Страница 47: ...2 14 TM 500 User s Guide Dual Tray Feeder Input Output Module D292144 5 fm...
Страница 83: ...3 36 TM 500 User s Guide The Setup Screens D292144 6 fm...
Страница 187: ...7 14 TM 500 User s Guide Ethernet Networks D292144 10 fm...
Страница 254: ...751 Summit Avenue Mankato MN 56001 507 387 2039 FAX 507 387 2257 www vtekusa com Email info vtekusa com...