D292144.8.fm
Preparing to Run a Pre-programmed Job
Chapter 5: Operation
5- 15
Run the Job
1.
Turn the
Omron Ionizing Fan
ON
. (optional)
2.
Close the enclosure doors, then press
Run
.
3.
During operation, the operator will add additional parts to the
Input Module
and unload packaged parts from the
Output
Module
and
Reject Area
as necessary.
4.
When the preset number of parts has been run, the TM-500 will automatically stop
operation.
5.
If
Leader
has been created, the
Taper
will continue to seal tape until it reaches the
programmed
Leader
length. If not, the
Taper
will continue to seal tape until the last
sealed part has reached the cut point. Cut the sealed tape at the cut point and use
a piece of blue Permacel tape to secure the finished reel. Remove processed
output.
6.
If the
Automatic Tape Cutter
is enabled, the tape will automatically be cut after the
programmed Leader length has been created (Single Reel Mode) or between the
Current Reel’s Leader and the next reel’s Trailer (Multiple Reel Mode).
Step 9:
Run
Job
Содержание TM-500
Страница 2: ...European Representative QNET BV Hommerterweg 286 6436 AM Amstenrade The Netherlands...
Страница 17: ...Contact Information D292144 2 fm xiv...
Страница 21: ...Table of Contents D292144 3a fm...
Страница 47: ...2 14 TM 500 User s Guide Dual Tray Feeder Input Output Module D292144 5 fm...
Страница 83: ...3 36 TM 500 User s Guide The Setup Screens D292144 6 fm...
Страница 187: ...7 14 TM 500 User s Guide Ethernet Networks D292144 10 fm...
Страница 254: ...751 Summit Avenue Mankato MN 56001 507 387 2039 FAX 507 387 2257 www vtekusa com Email info vtekusa com...