9
RTAA-IOM-3
Literature Change History
RTAA-IOM-3 (October 1991)
Original manual. Covers installation,
operation, and maintenance of “CO”
design sequence RTAA-130 thru
RTAA-400 units.
Unit Identification
When the unit arrives, compare all
nameplate data with ordering and
shipping information.
Unit Inspection
When the unit is delivered, verify that it
is the correct unit and that it is property
equipped. Compare the information
which appears on the unit nameplate
with the ordering and submittal
information. Refer to “Nameplates”.
Note:
If the Remote Evaporator Option
is ordered, the remote evaporator will
be shipped in a separate crate. The
serial number on the evaporator
nameplate must match the serial
number on the outdoor unit
nameplate.
Caution: If the serial numbers on
the remote evaporator and the
outdoor unit do not match, do not
proceed with the installation.
Notify the appropriate Trane Sales
Office.
Inspect all exterior components for
visible damage. Report any apparent
damage or material shortage to the
carrier and make a “unit damage”
notation on the carrier’s delivery
receipt. Specify the extent and type of
damage found and notify the
appropriate Trane Sales Office.
Do not proceed with installation of a
damaged unit without sales off ice
approval.
Inspection Checklist
To protect against loss due to damage
incurred in transit, complete the
following checklist upon receipt of the
unit.
[ ] Inspect the individual pieces of the
shipment before accepting the unit.
Check for obvious damage to the
unit or packing material.
[ ] Inspect the unit for concealed
damage as soon as possible after
delivery and before it is stored.
Concealed damage must be
reported within 15 days.
[ ] If concealed damage is discovered,
stop unpacking the shipment. Do
not remove damaged material from
the receiving location. Take photos
of the damage, if possible. The
owner must provide reasonable
evidence that the damage did not
occur after delivery.
[ ] Notify the carrier’s terminal of the
damage immediately, by phone and
by mail. Request an immediate,
joint inspection of the damage with
the carrier and the consignee.
[ ] Notify the Trane sales representative
and arrange for repair. Do not repair
the unit, however, until damage is
inspected by the carrier’s
representative.
Loose Parts Inventory
Check all the accessories and loose
parts which are shipped with the unit
against shipping list. Included in these
items will be water vessel drain plugs,
rigging and electrical diagrams, and
service literature, which are placed
inside the control panel and/or starter
panel for shipment.
General
Information
Содержание RTAA-130
Страница 2: ... American Standard Inc 1991 ...
Страница 8: ...8 RTAA IOM 3 ...
Страница 13: ...13 RTAA IOM 3 Figure 3 Typical RTAA Packaged Unit 240 400 Tons Control Panel Evaporator Outlet Inlet ...
Страница 24: ...24 RTAA IOM 3 ...
Страница 26: ...26 RTAA IOM 3 Figure 9 Dimensions and Clearances for RTAA Packaged Unit 130 to 200 Ton RTAA SU 1000E ...
Страница 27: ...27 RTAA IOM 3 Figure 10 Dimensions and Clearances for RTAA Packaged Unit 240 300 Ton RTAA SU 1001C ...
Страница 28: ...28 RTAA IOM 3 Figure 11 Dimensions and Clearances for RTAA Packaged Unit 340 to 400 Ton RTAA SU 1002C ...
Страница 38: ...38 RTAA IOM 3 RTAA SA 2002C Figure 19 Spring Isolator Placement for Typical RTAA Packaged Unit 240 400 Tons ...
Страница 46: ...46 RTAA IOM 3 Figure 24 Typical Domestic Water Heater Piping Figure 25 Typical Domestic Water Heater Piping ...
Страница 50: ...50 RTAA IOM 3 Figure 30 Refrigerant Circuit Identification ...
Страница 52: ...52 RTAA IOM 3 Figure 31 Remote Evaporator Piping Example ...
Страница 58: ...58 RTAA IOM 3 Continued on Next Page Figure 34 Typical Field Wiring for RTAA Packaged Unit 130 to 200 Tons ...
Страница 59: ...59 RTAA IOM 3 Continued from Previous Page See Notes on Next Page ...
Страница 61: ...61 RTAA IOM 3 Figure 35 Typical Field Wiring for RTAA Packaged Unit 240 400 Tons Continued on Next Page ...
Страница 63: ...63 RTAA IOM 3 Continued from Previous Page See Notes on Page 61 ...
Страница 64: ...64 RTAA IOM 3 Figure 36 Typical Field Wiring for RTAA With Remote Evaporator Option Continued on Next Page ...
Страница 65: ...65 RTAA IOM 3 Continued from Previous Page See Notes on Page 61 ...
Страница 76: ...76 RTAA IOM 3 ...
Страница 78: ...78 RTAA IOM 3 Figure 40 Refrigeration System and Control Components Single Circuit Continued on Next Page ...
Страница 80: ...80 RTAA IOM 3 Figure 41 Refrigeration System and Control Components Duplex Circuit Continued on Next Page ...
Страница 92: ...92 RTAA IOM 3 Figure 51 Operator Interface Controls ...
Страница 120: ...120 RTAA IOM 3 ...
Страница 126: ...126 RTAA IOM 3 Figure 56 Unit Sequence of Operation RTAA 240 to 400 Tons Continued on Next Page ...
Страница 127: ...127 RTAA IOM 3 Continued from Previous Page 2307 1566C ...
Страница 128: ...128 RTAA IOM 3 Figure 57 Unit Sequence of Operation RTAA 130 to 200 Tons 2306 9122A ...
Страница 132: ...132 RTAA IOM 3 Figure 58 Operator s Log ...
Страница 138: ...138 RTAA IOM 3 ...