![Thermo Scientific 410iQ Скачать руководство пользователя страница 41](http://html.mh-extra.com/html/thermo-scientific/410iq/410iq_instruction-manual_1105140041.webp)
Operation
Calibration
Thermo Scientific
410iQ Instruction Manual
3-15
The Zero/Span Schedule is used to program the instrument to perform
fully automated zero and span checks or adjustments.
Home Screen>Calibration>Zero/Span Schedule
Home Screen>Calibration>Zero/Span Schedule>More
The Zero/Span Schedule contains the following information:
●
Zero/Span Schedule:
Toggles zero/span schedule Enabled or Disabled.
●
Next Time:
Allows the user to view and set the initial date and time
(24-hour format) of the zero/span schedule.
●
Period:
Defines the period or interval between zero/span checks or
calibrations. If period = 0, the schedule runs continuously.
●
Zero Duration:
Sets how long zero air is sampled by the instrument.
●
Span Duration:
Sets how long span gas is sampled by the instrument.
●
Purge Duration:
Sets how long the purge period will be at the end of
the schedule.
Zero/Span Schedule
Содержание 410iQ
Страница 1: ...410iQ Instruction Manual Carbon Dioxide Analyzer 117081 00 1Apr2020 ...
Страница 2: ......
Страница 18: ......
Страница 35: ...Operation Instrument Display Thermo Scientific 410iQ Instruction Manual 3 9 ...
Страница 160: ......
Страница 171: ...Calibration Calibration Thermo Scientific 410iQ Instruction Manual 4 11 ...
Страница 180: ...Maintenance Pump Rebuilding 5 4 410iQ Instruction Manual Thermo Scientific Figure 5 2 Pump Rebuilding ...
Страница 188: ......
Страница 197: ...Servicing Fan Replacement Thermo Scientific 410iQ Instruction Manual 7 9 Figure 7 10 Replacing the Fan ...
Страница 231: ...Servicing DMC Optical Bench Thermo Scientific 410iQ Instruction Manual 7 43 Figure 7 48 Filter Wheel ...
Страница 264: ......
Страница 284: ......
Страница 304: ......
Страница 305: ......