Installing and Maintaining the Server
Maintaining the Lightspeed Server
50
Lightspeed Live Capture User Guide
Rebuilding the Lightspeed Live Storage RAID
The MegaRAID Storage Manager software on the Lightspeed Live server enables you to
rebuild the storage RAID if necessary, such as when you add a new drive, or want to
change drive configurations. The MegaRAID Storage Manager is located at:
C:\Program Files (x86)\MegaRAID Storage Manager
In the MegaRAID Storage Manager folder, locate the
startupui.bat
file and double-
click it to start the application. In the initial application panel, click on the server you
want to work with, then enter your credentials to log in. The MegaRAID Storage
Manager application opens.
Replacing Power Supplies
The Lightspeed Live server includes two redundant, hot-pluggable power supply
modules. They automatically sense the input voltage between 100v to 240v, and
operate at that voltage. Power cords plug directly into the power supply units at the
back of the chassis. A green light indicates that the power supply is operating. When a
power supply fails or loses power, an amber light on the power supply illuminates and
an alarm sounds.
If either of the power supply modules fail, the other module will support the full load
and will allow the system to continue operation without interruption. The PWR Fail LED
will illuminate and remain on until the failed unit has been replaced. Replace with the
same model. Replacement units can be ordered from Telestream. See
Appendix A:
Support
in this guide for information about contacting Telestream Support to order parts.
Replacing the Power Supply
1.
Unplug the AC power cord from the failed power supply module.
2.
Push in the locking tab at the back of the module to release it.
3.
Pull the unit straight out of the chassis.
CAUTION:
The power supply may be very hot when first unplugged and could cause
burns. Handle carefully by the edges and do not touch hot components.
4.
Insert the new unit into the chassis, pushing it in until it clicks firmly in place.
5.
Reconnect the power cord.
Содержание lightspeed live capture
Страница 1: ...June 2019 277130 Lightspeed Live Capture Guide Live Capture 3 0 with ComponentPac 7 2...
Страница 22: ...Contents 22...
Страница 52: ...Installing and Maintaining the Server Monitoring Lightspeed Live via SNMP 52 Lightspeed Live Capture User Guide...
Страница 196: ...Using the Tape Capture Web Application Using the Job Status View in Tape Capture 196 Lightspeed Live Capture User Guide...
Страница 208: ...Calculating Live Capture Resources Lightspeed Live Capture Resource Calculator 208 Lightspeed Live Capture User Guide...
Страница 216: ...Appendix A Support Using Log Files and Other Support Information 216 Lightspeed Live Capture User Guide...
Страница 316: ...Appendix B Containers Codecs and Vantage Actions Vantage Actions 316 Lightspeed Live Capture User Guide...