
51
Maintenance
Rhino
TM
43/54
ENGINE CRANkCASE VENT TUBE
Remove and clean every 600 hours or 12 months. If you operate the engine in dusty
conditions, clean the tube at shorter intervals.
1. Remove and clean crankcase vent tube.
2. Install the vent tube. Be sure the O-ring fits correctly in the rocker arm cover
for elbow adapter. Tighten hose clamp securely.
ENGINE VAlVE ClEARANCE
Check/adjust every 1000 hours. See authorized engine service dealer or refer to Engine
Manual for procedures.
EMISSION REGUlATION/ENGINE RPM
Do not adjust operating speed above published specification. See Technical Data sec-
tion for engine speed.
Do not adjust idle speed above above published specification. See Technical Data
section for engine speed.
Do not alter injection pumps.
TAMPERING with the following engine factory settings is ILLEGAL except to reset to pub-
lished specifications and reseal by authorized engine dealer:
- Engine Timing
- Fuel Delivery
- Aneroid Settings
- Rated Speed
FUEl INJECTORS
Escaping fluid under pressure can penetrate the skin causing serious in-
jury. Relieve pressure before disconnecting fuel or other lines. Tight-
en all connections before applying pressure. Keep hands and body away
from pinholes and nozzles that eject fluids under high pressure. Use a
piece of cardboard or paper to search for leaks. Do not use your hand.
If ANY fluid is injected into the skin seek medical attention immediately.
IMPORTANT: Always use Kubota replacement parts meeting Kubota performance
specifications. Only qualified technicians should attempt fuel injector diagnosis.
Fuel injection nozzles are usually removed and tested or replaced when there is a notice-
able loss of power or excessive smoking after break-in period. For detailed testing and
diagnostic information on fuel system refer to Kubota Engine Manual (P/N 56956).
WARNING
Содержание Rhino 43 Series
Страница 7: ... Stone Construction Equipment Inc 1 Introduction ...
Страница 9: ... Stone Construction Equipment Inc 2 Technical Data ...
Страница 17: ...17 Stone Construction Equipment Inc 3 Health Safety ...
Страница 25: ...25 Stone Construction Equipment Inc 4 Operation ...
Страница 39: ...39 Stone Construction Equipment Inc 5 Maintenance ...