
2
Operation
Rhino
TM
43/54
WARNING
DElIVERY INSPECTION
Upon receipt of your roller, CAREFULLY CHECK FOR ANY FREIGHT DAMAGE. Any damage
should be immediately reported to the carrier and a claim registered.
Rhino is manufactured to the strictest specifications and inspection procedures. If any
material or manufacturing defects are found, return the tag on the machine with the
assembler’s signature and your findings to the manufacturer. We want to know when a
product is less than perfect. We also welcome any and all input on how the product may
serve you better.
The following instructions were compiled to provide you information on how to obtain
long and trouble free use of the roller. Periodic maintenance of the roller is essential.
Read the manual in its entirety and follow the instructions carefully. Refer to the Tech-
nical Data Section to familiarize yourself with machine controls and components. Failure
to do so may injure yourself or a bystander.
BREAk-IN PERIOD
The Rhino roller is ready for normal operation. However, extra care during the first 50
hours of operation will result in more satisfactory, long-term machine performance and
cost of ownership. Do not exceed 50 hours of operation before conducting the break-in
first service. See First Service 50 Hours in the Maintenance Section.
• Run engine at full throttle.
• Run engine under load. DO NOT overload the engine.
• Idle engine 3 minutes before stopping.
• DO NOT idle engine for long periods.
• Check engine oil level daily.
BEFORE STARTING
Review the following information. Specific information regarding these items can be
found in the Technical Data Section or located by the Table of Contents.
Fuel is highly flammable, handle with care. Do not refuel the engine
while smoking or when near an open flame or sparks. Always stop en-
gine before refueling. Clean up spilled fuel before starting. Avoid
fires by keeping engine clean of accumulated grease and debris.
Diesel fuel stored in galvanized containers reacts chemically with the zinc coat-
ing on the container. The chemical reaction creates powdery flakes of zinc
sulfide. If water is present in the fuel, a zinc hydroxide gel will form.
Do not run unit in an enclosed, unventilated area. Avoid
prolonged breathing of exhaust gases.
Содержание Rhino 43 Series
Страница 7: ... Stone Construction Equipment Inc 1 Introduction ...
Страница 9: ... Stone Construction Equipment Inc 2 Technical Data ...
Страница 17: ...17 Stone Construction Equipment Inc 3 Health Safety ...
Страница 25: ...25 Stone Construction Equipment Inc 4 Operation ...
Страница 39: ...39 Stone Construction Equipment Inc 5 Maintenance ...