
0
Operation
Rhino
TM
43/54
VISUAl INSPECTION
Make a thorough inspection of the engine compartment daily. Look for oil or coolant
leaks, worn fan belt, loose connections and trash build-up. Remove trash build-up and
have repairs made as needed if leaks are found.
NOTE:
Wipe all fittings, caps, and plugs before performing any maintenance to reduce
the chance of system contamination.
• Air intake system hoses and connections for cracks and loose clamps.
• Fan belt for cracks, breaks, or other damage.
• Water pump for coolant leaks.
MOUNTING/DISMOUNTING THE MACHINE
The machine is fitted with steps and hand rails. Caution should be used when mount-
ing and dismounting the machine. DO NOT remove or modify steps or hand rails. Using
the steps and hand rails, it is recommended to mount and dismount facing the operator’s
seat. DO NOT jump from machine or personal injury may occur.
STARTING THE MACHINE
• Operator must always be seated and seat belt must be worn.
• Forward/reverse must be in NEUTRAL position.
• Throttle should be set at idle.
• Turn key clockwise to “preheat” position until preheat lamp turns off.
• Turn key clockwise until the engine cranks over. Release the key when the en-
gine starts. DO NOT crank the engine for more than 20 seconds at a time.
• Check all gauges for normal engine operation. If operation is not normal, stop
the engine and determine cause.
COlD WEATHER STARTING
If the ambient temperature is below 23° F (-5° C) preheating times may be lengthened.
The preheat lamp goes off after 6 seconds. At low ambient temperatures, preheat for 10
seconds and no more than 20 seconds. If engine fails to start, repeat preheat cycle.
Do not use starting fluid (ether). Engine is equipped with intake heater. An
explosion or fire may result. Refer to cold weather starting instructions.
WARNING
Содержание Rhino 43 Series
Страница 7: ... Stone Construction Equipment Inc 1 Introduction ...
Страница 9: ... Stone Construction Equipment Inc 2 Technical Data ...
Страница 17: ...17 Stone Construction Equipment Inc 3 Health Safety ...
Страница 25: ...25 Stone Construction Equipment Inc 4 Operation ...
Страница 39: ...39 Stone Construction Equipment Inc 5 Maintenance ...