- 76 -
No.JXC#-OMX0009-A
15. Operation Instructions
The following describes how to instruct the operation by step data No. instruction, operation by numerical
instruction, and operation of the data edit function.
15.1 Operation procedure for Operation by Step date No.
Refer to the following "Procedures" and "Timing charts" for details of the Return to Origin, operation
mode procedures and the signal timing.
[1] Power on and Return to Origin position
- Procedure -
- Timing chart Power on and Return to Origin position -
①
Turn the power supply ON.
When the initialization of the
controller is over, RWr0, bit6
:
Initial is
turned on.
↓
②
Turn ON “SVON”.
↓
③
"SVRE" turns ON.
The time when “SVRE” turns
ON depends on the type of
electric actuator and the
customers application.
The
electric actuator with lock is
unlocked.
↓
④
Turn ON "SETUP".
↓
⑤
"BUSY" turns ON.
(The actuator starts the operation.)
After "BUSY" turns ON,
"SETUP" will turn OFF.
↓
⑥
"SETON" and "INP" will turn ON.
Return to origin is completed when
"INP" turns ON.
Power
SVON
SETUP
BUSY
SVRE
SETON
INP
RWr0,bit6
Initial
External Lock
Electric actuator
Output
Input
Return to origin
24V
0V
If the electric actuator is w ithin the "In position" range,
INP w ill be turned ON but if not, it w ill remain OFF.
OFF
ON
ON
OFF
ON
OFF
Speed
0mm/s
・
・
・
・
・
・
・
・
・
・
・
・
・