20
3.
Installation and wiring
·
The performance of the product varies depending on the surrounding installation and operating conditions. It
is recommended to investigate in advance any processes and parts where static electricity disturbances occur.
Verify that the required conditions have been met in order to effectively remove static electricity before
installation.
·
After installation, verify the performance of this product.
3-1. Installation of Ionizer
3-1-1. Precautions for Installation
·
Be sure to stop power supply and air supply to the product before starting the product installation.
·
Do not affix any tape or labels to the nozzle. Dielectric phenomenon may occur due to ions arising from such
substances, resulting in electrostatic charging or electric leakage.
3-1-2. Adjustment of Pressure (Flow adjustment)
·
When air is supplied to the nozzle, adjust the flow using a regulator which should be connected immediately
before the nozzle. If a flow adjustment valve is used between the nozzle and regulator, the speed of the flow
from the nozzle decreases due to the pressure decrease, decreasing the neutralizing performance.
·
Check the pressure around the nozzle air supply port. A pressure difference may be generated between the
regulator pressure and the pressure at the nozzle air supply port due to the supply piping length and piping
diameter. If a pressure gauge with regulator is used for checking the pressure, use a large capacity regulator,
keep the piping as short as possible or make the piping diameter larger.
·
When installing a flow meter to the air circuit, refer to “5-4. Flow - Pressure characteristics” to choose the
product type so that the flow of the nozzle does not exceed the flow meter rated flow range. If the nozzle's
flow consumption is larger than the rated flow of the selected flow meter, the flow supplied to the nozzle is
limited, thus deteriorating neutralization performance.
3-1-3. Installation of bracket for nozzle
·
Use specifies bracket.
1) L-type bracket
·
For mounting, fix the bracket using M3x4 screws with the specified tightening torque.
Tightening torque: 0.61 to 0.65 Nm
2) Angle adjustment bracket
·
For mounting, fix the bracket using M3x4 screws with the specified tightening torque.
Tightening torque: 0.61 to 0.65 Nm
Flow adjustment valve
Pressure regulator
IZT43-BL1 /
L-type bracket
M3 screw
IZT43-BL2 /
Angle adjustment bracket
M3screw
Содержание IZT43 Series
Страница 1: ...Document No IZ OMX0087 PRODUCT NAME Ionizer MODEL Series IZT43 series...
Страница 59: ...Controller IZTC41 IZTC41 P When DIN rail mounting bracket IZT40 B1 is used When power supply cable is inserted...
Страница 60: ...High voltage power supply module IZTP43 When DIN rail mounting bracket IZT40 B2 is used...