Engineering and remote access
7.3 SIMATIC STEP 7 in the TIA Portal
PSU8600power supply systems
140
Manual, 04.2016, A5E35883207-7-76
Procedure
1.
In the Project tree, right-click on the SITOP PSU8600 controller.
The shortcut menu opens.
2.
In the shortcut menu, in submenu "Download to device", select option "Hardware
configuration".
The project data are compiled. The "Load" button is activated as soon as loading is
possible.
3.
Click on "Load".
Data is loaded. The "Result of the load operation" dialog window is opened. In this dialog,
you can check whether the load task was successful and select any further actions.
4.
Click on the "Finish" button.
The selected project data have been loaded to the SITOP PSU8600 via the controller.
Содержание SITOP BUF8600
Страница 6: ...Overview PSU8600power supply systems 6 Manual 04 2016 A5E35883207 7 76 ...
Страница 12: ...Safety instructions PSU8600power supply systems 12 Manual 04 2016 A5E35883207 7 76 ...
Страница 164: ...Engineering and remote access 7 4 SIMATIC STEP 7 PSU8600power supply systems 164 Manual 04 2016 A5E35883207 7 76 ...
Страница 240: ...Technical data 9 9 Dimension drawings PSU8600power supply systems 240 Manual 04 2016 A5E35883207 7 76 ...
Страница 246: ...Environmental conditions PSU8600power supply systems 246 Manual 04 2016 A5E35883207 7 76 ...
Страница 250: ...Environment PSU8600power supply systems 250 Manual 04 2016 A5E35883207 7 76 ...