
ET 200pro FC
Operating Instructions, 07/2016, A5E01100763B AC
85
Commissioning (hardware)
6
Introduction
Hardware commissioning involves the ET 200pro station and the drive components.
The following procedure describes by way of example the commissioning of a minimum
configuration on PROFIBUS DP, with an S7 controller as the master and STARTER software
directly on the optical interface of the frequency converter.
It is assumed that the user has the necessary knowledge of STARTER to create a drive
configuration and to use the operating panel.
Preconditions
Table 6- 1
Preconditions for commissioning
Actions
Reference
ET 200pro is mounted
Chap.
Assembling
PROFIBUS address is set on interface module and IM is
wired
Interface module manual
ET 200pro is configured
Chap.
Planning/Configuring
Motor is connected
Chap.
Assembling
Power supply to the DP master is ON
Manual for the DP master
The DP master is set to RUN mode
Manual for the DP master
6.1
Startup of ET 200pro
Procedure
Switch on the power supply for the ET 200pro station (electronics/encoder supply 1L+ for the
ET 200pro).
Содержание Simatic ET 200pro FC
Страница 1: ......
Страница 2: ......
Страница 12: ...Table of contents ET 200pro FC 12 Operating Instructions 07 2016 A5E01100763B AC ...
Страница 158: ...Technical data 10 2 General ambient conditions ET 200pro FC 158 Operating Instructions 07 2016 A5E01100763B AC ...
Страница 180: ...Appendix A 3 Standards ET 200pro FC 180 Operating Instructions 07 2016 A5E01100763B AC ...
Страница 190: ...List of abbreviations acronyms B 1 Abbreviations ET 200pro FC 190 Operating Instructions 07 2016 A5E01100763B AC ...
Страница 192: ...Glossary ET 200pro FC 192 Operating Instructions 07 2016 A5E01100763B AC ...
Страница 195: ......
Страница 196: ......