
Commissioning and optimization (software)
7.4 Commissioning of communication between the S7 CPU and the frequency converter
ET 200pro FC
Operating Instructions, 07/2016, A5E01100763B AC
117
Image 7-7
Request processing in OB1
Once the parameter request has been executed successfully, the request header (defined in
DB47) must be mirrored in DB1 (requestID does not indicate any errors).
To view the data currently stored in DB1, open DB1 in Simatic Manager and click the
glasses icon.
Содержание Simatic ET 200pro FC
Страница 1: ......
Страница 2: ......
Страница 12: ...Table of contents ET 200pro FC 12 Operating Instructions 07 2016 A5E01100763B AC ...
Страница 158: ...Technical data 10 2 General ambient conditions ET 200pro FC 158 Operating Instructions 07 2016 A5E01100763B AC ...
Страница 180: ...Appendix A 3 Standards ET 200pro FC 180 Operating Instructions 07 2016 A5E01100763B AC ...
Страница 190: ...List of abbreviations acronyms B 1 Abbreviations ET 200pro FC 190 Operating Instructions 07 2016 A5E01100763B AC ...
Страница 192: ...Glossary ET 200pro FC 192 Operating Instructions 07 2016 A5E01100763B AC ...
Страница 195: ......
Страница 196: ......