
Series commissioning and operation
8.1 Transfer of the frequency converter parameter assignment
ET 200pro FC
Operating Instructions, 07/2016, A5E01100763B AC
137
The parameter download is triggered via STARTER, from the project file in the frequency
converter's RAM.
Note
When making use of this download procedure, you must bear in mind the following important
constraints:
•
During the download process, the frequency converter will not be able to respond to any
commands.
•
Once the download procedure is under way, there is no way of stopping it again.
•
If the data being downloaded are incompatible with the frequency converter, the relevant
parameters in the frequency converter's memory will revert to their default values.
•
In the event of an unsuccessful download, the frequency converter will not function as it
should.
When parameters are being downloaded from the PC to the frequency converter's
EEPROM, the LEDs will flash. If the frequency converter experiences a fault condition, the
fault is indicated by the LEDs (SF on, RY/RDY off). The download will be carried out
regardless.
Prerequisites
●
The download converter's power supply must be connected.
●
The download converter is in the "Ready to run" state.
Connect the STARTER PC to the download frequency converter via RS232 (point-to-point
connection, appropriate connecting cable required) or via fieldbus, press the online button
and perform the download using the ("Download project to target system") button.
The transferred parameters must then be saved in the frequency converter so that they are
powerfail-proof by pressing the
("RAM to ROM") button.
Remark
An online connection can only be established between the PC and frequency converter via
fieldbus if the following conditions are met:
●
The interface module of the ET 200 station is running in DPV1 mode.
●
The PC must be connected to the fieldbus directly.
See also
Series commissioning (Page 141)
Содержание Simatic ET 200pro FC
Страница 1: ......
Страница 2: ......
Страница 12: ...Table of contents ET 200pro FC 12 Operating Instructions 07 2016 A5E01100763B AC ...
Страница 158: ...Technical data 10 2 General ambient conditions ET 200pro FC 158 Operating Instructions 07 2016 A5E01100763B AC ...
Страница 180: ...Appendix A 3 Standards ET 200pro FC 180 Operating Instructions 07 2016 A5E01100763B AC ...
Страница 190: ...List of abbreviations acronyms B 1 Abbreviations ET 200pro FC 190 Operating Instructions 07 2016 A5E01100763B AC ...
Страница 192: ...Glossary ET 200pro FC 192 Operating Instructions 07 2016 A5E01100763B AC ...
Страница 195: ......
Страница 196: ......