MX-C250 SIMULATION 6 – 27
43-21
Purpose
Adjustment/Setup
Function (Purpose)
Used to set the environment correction
under high temperature and high humidity
(H/H) for the fusing temperature setting
(SIM 43-1) in each paper mode.
Section
Operation/Procedure
1) Select an item to be set with Arrow keys.
2) Enter the set value with 10 keys.
3) Press [OK]/[START] key.
The set value in step 2) is saved.
Correction value: -49 - +49, 1 Count = 1 degree C Change
*1: 1 Count = 1sec Change
<Code descriptions>
Correction
value
-49
-25
-5
0
5
25
49
Input value
1
25
45
50
55
75
99
Item/Display
Content
Set-
ting
range
Group
A
Group
B
Group
C
Acc.
Desti-
nation
set-
ting(O
/X)
1
HL_UM READY HH
(HH-Correction) Ready standby TH_UM set value
1 - 99
50
50
50
X
2
HL_UM PLAIN BW HH
(HH-Correction) Black-White plain paper TH_UM set value
1 - 99
50
50
50
X
3
HL_UM PLAIN CL HH
(HH-Correction) Color plain paper TH_UM set value
1 - 99
50
50
50
X
4
WARMUP FUMON TMP HH
(HH-Correction) Fusing motor pre-rotation start TH_UM set value
1 - 99
50
50
50
O
5
WARMUP FUMOFF HH
(HH-Correction) Fusing motor pre-rotation end TH_LM set value
1 - 99
50
50
50
X
6
WARMUP END TIME HH
(HH-Correction) Warm-up complete time (warm-up time (sec))
1 - 99
50
50
50
X
7
HL_UM HEAVY HH
(HH-Correction) Heavy paper TH_UM set value
1 - 99
50
50
50
X
8
HL_UM OHP HH
(HH-Correction) OHP-TH_UM set value
1 - 99
50
50
50
X
9
HL_UM ENV HH
(HH-Correction) Envelope TH_UM set value
1 - 99
50
50
50
X
10
HL_UM GLOSS HH
(HH-Correction) Glossy paper TH_UM set value
1 - 99
50
50
50
X
11
HL_UM E-STAR HH
(HH-Correction) Preheating TH_UM set value
1 - 99
50
50
50
X
12
HL_UM PRE-JOB HH
(HH-Correction)Resetting from preheating TH_UM set value (Job Ready
temperature)
1 - 99
50
50
50
X
13
HL_UM HEAVY2 CL HH
Correction value for heavy paper 2 TH_UM set value under LL environment
-
50
50
50
14
HL_UM WARMUP_120L
HH
(HH-Correction) Warm-up TH_UM set value (when the fusing temperature
is under 120 degrees C)
1 - 99
50
50
50
X
15
LO_WARMUP_TIME HH
(HH-Correction) Warm-up TH_UM applying time is under 120 degrees C
(Timer from completion of warm-up)
1 - 99
50
50
50
X
16
HL_UM WARMUP_120H
HH
(HH-Correction) Warm-up TH_UM applying time is 120 degrees C or above
(Timer from completion of warm-up)
1 - 99
50
50
50
X
17
HI_WU_TIME HH
P applying time (timer from warm-up complete)
1 - 99
50
50
50
X
18
HI_WU_FM_ON_TMP HH
(HH-Correction) Fusing roller rotation start TH_E (when the fusing tempera-
ture in warm-up is alpha degrees C or above)
1 - 99
50
50
50
X
19
HI_WU_END_TIME HH
(HH-Correction) Warm-up complete time (sec) (when the fusing tempera-
ture in warm-up is alpha degrees C or above)
1 - 99
50
50
50
X
20
HI_WU_JOB_SET_TMP
HH
(HH-Correction) Job Ready TH_UM temperature (when the fusing tempera-
ture in warm-up is alpha degrees C or above)
1 - 99
50
50
50
X
21
HI_WARMUP_BORDER
HH
The threshold value alpha degree C or above in warm-up.
1 - 99
50
50
50
X
22
LO_WU_JOB_SET_TMP
HH
The applying time in WUP TH_UM (CL) of 120dgrees C or above (Timer
from completion of warm-up)
1 - 99
50
50
50
X
23
JOBEND_FUMON_TIME
HH
(HH-Correction) Fusing roller rotation time (sec) after completion of a job
1 - 99
50
50
50
X
24
HI_WU_JOB_SET_TMP_H
H_BW
The applying time in WUP TH_UM (BW) of 120dgrees C or above (Timer
from completion of warm-up)
1 - 99
50
50
50
X
TH_UM
Fusing upper thermister (center)
HL_UM
Heater lamp upper
TH_LM
Fusing lower thermister
HL_LM
Heater lamp lower
TH_E
Fusing thermister (external heat roller)
HL_E
Heater lamp (external heat roller)
Group
Destination
Group A
Japan
China
AB_B
-
Group B
U.S.A.
Canada
Inch
-
Group C
Europe
U.K.
AUS
AB_A