SP LINK | Using SP LINK
Doc #OI0005 Rev26 2020
|
11
Select Unit Application
The first three options are for grid connected systems
only (Solar Hybrid). The
Off Grid
Option is only
applicable when no grid is available.
When
Self-Consumption of Renewables
is chosen in
a system with Lead-Acid batteries, the system will do a
full recharge once per week. The time can be changed to
coincide with the period of lowest tariff and at a time when
the renewable would have performed a full charge when
available.
A full recharge is not required for lithium batteries.
Extra Options
If you are using an
External AC Source contactor
and
current transformers then enter it here.
Where a
Grid Fail Generator Backup kit
is installed
then select this option.
PLEASE NOTE
: For a three phase
Powerchain system, three Grid Fail
Generator Backup kits are installed. One in
each SP PRO phase manager.
Set the
AC Source Limit
to match the capacity of the AC
Source connected to the SP PRO.
Max Grid Input Power
. The SP PRO will attempt to
keep the power that is taken from the AC Source below
this limit by supporting any excess load power from the
battery bank.
Max Grid Export Power
. The SP PRO will limit the
power that is exported to the AC Source below this value
by limiting the power produced by managed AC coupled
solar or DC coupled solar.
Generic AC coupled solar cannot be export limited by the
SP PRO.
Содержание SP PRO 2i Series
Страница 1: ...Instruction Manual for SP LINK Configuration and monitoring for SP PRO series 2i ...
Страница 31: ...SP LINK Using SP LINK Doc OI0005 Rev26 2020 31 Blank Page ...
Страница 91: ...SP LINK Performance Monitoring Doc OI0005 Rev26 2020 91 BLANK PAGE ...
Страница 97: ...SP LINK Service Settings Doc OI0005 Rev26 2020 97 Blank Page ...