SP LINK | Using SP LINK
10
|
Doc #OI0005 Rev26 2020
Source of Renewables
Select the configuration of the Solar or other renewable
energy sources in the system. The wizard will ask you for
more information on the next screen.
If the energy source is
DC coupled
(that is fed into the
battery via a DC charge regulator or DC MPPT) then an
external DC current shunt must be installed.
Managed AC Coupled Solar Inverters.
This screen is displayed when
Managed AC Coupled Solar
is selected on the previous screen. The Selectronic Certified
or Select Sun grid inverter is selected.
Grid Inverter number of phases
. Select the type of grid
inverter to be installed. Only the Fronius or Select Sun three
phase grid inverters can be installed and only on a three
phase SP PRO configuration
Grid Inverters per phase
. The number of grid inverters
connected to each of the phases in a Powerchain three
phase or split-phase system. For a single phase system
enter the number of grid inverters connected to L1.
Whilst the SP PRO is connected to grid power, the maximum
allowable Managed AC coupled solar power is only limited
by the selected SP PRO model.
When the SP PRO is running Islanded (either the grid has
failed or the system is an Off Grid system), the SP PRO will
limit the maximum solar power that can be produced by the
Selectronic Certified or Select Sun grid inverters. This limit is
determined by the system battery capacity as displayed on
the screen.
Содержание SP PRO 2i Series
Страница 1: ...Instruction Manual for SP LINK Configuration and monitoring for SP PRO series 2i ...
Страница 31: ...SP LINK Using SP LINK Doc OI0005 Rev26 2020 31 Blank Page ...
Страница 91: ...SP LINK Performance Monitoring Doc OI0005 Rev26 2020 91 BLANK PAGE ...
Страница 97: ...SP LINK Service Settings Doc OI0005 Rev26 2020 97 Blank Page ...