R&S AFQ100A
Putting into Operation
1401.3078.62
1.12
E-3
Putting into Operation
The following section describes the procedure for putting the instrument into operation and the
connection of peripherals such as keyboard, mouse, and monitor. It contains general safety instructions
for instrument operation.
The installation of options and the firmware update are described in chapter 4 of the
s
ervice
m
anual.
Unpacking the Instrument
Remove the instrument from its packaging and check the equipment for completeness using the
delivery note and the accessory lists for the various items.
First, pull off the polyethylene protection pads from the instrument's rear feet and then carefully
remove the pads from the instrument handles at the front.
Pull off the corrugated cardboard cover that protects the rear of the instrument.
Carefully unthread the corrugated cardboard cover at the front that protects the instrument handles
and remove it.
Check the instrument for any damage. If there is damage, immediately contact the carrier who
delivered the instrument. In this case, make sure not to discard the box and packing material.
It is advisable to keep the original packing material in order to prevent control elements and
connectors from being damaged in case the instrument is to be transported or shipped at a later
date.
Installing the Instrument in a 19" Rack
The instrument is designed for indoors use. It can either be set up independently or mounted in a 19´´
rack. Installing the instrument in a rack requires a rack adapter (refer to data sheet for Order No.). The
mounting instructions are supplied with the adapter.
NOTICE
Risk of overheating!
Insufficient airflow for cooling may cause overheating of the instrument.
Prior to putting the instrument into operation always check for space between the
ventilation holes and the rack casing to get sufficient air supply in the rack