R&S AFQ100A
Contents - Putting into Operation
1401.3078.62
I-1.1
E-3
Contents - Chapter 1 "Putting into Operation"
1
Putting into Operation .............................................................1.1
Unpacking the Instrument ................................................................. 1.12
Installing the Instrument in a 19" Rack.............................................. 1.12
Connecting the R&S AFQ to the AC Supply ..................................... 1.16
Booting the R&S AFQ ....................................................................... 1.18
Connecting the R&S AFQ to a Network (LAN)............................................... 1.25
Connection to the Network ................................................................ 1.25
Manual Remote Control via an External Controller........................................ 1.34
Configuration for Manual Remote Control via Windows Remote
Desktop Connection .......................................................................... 1.35
Configuration for Manual Remote Control via Ultr@VNC ................. 1.40
Preparing the Installation of Norton Antivirus.................................... 1.49