
SECTION 5
Pronar RC2100-2
5.21
with the system components. It is recommended to use preparations commercially available
designed to facilitate detecting air leaks. Damaged components should be replaced or
repaired. If leaks appear at connections then tighten the connections. If air continues to
escape, replace connection components or seals with new ones.
Check system tightness:
•
after travelling the first 1,000 km,
•
each time after making repairs or changing system components,
•
annually.
Visual inspection of the system
During tightness inspection attention should additionally be given to technical condition and
degree of cleanness of the system components. Contact of pneumatic conduit seals etc. with
oil, grease, petrol etc. may cause damage and accelerate the ageing process. Bent,
permanently deformed, cut or worn conduits should be replaced.
Visual inspection of the system
•
Conduct inspection of system at the same time as when checking tightness.
ATTENTION
Repair, exchange or regeneration of pneumatic system components may only be
performed in a specialised workshop.
Содержание RC2100-2
Страница 2: ......
Страница 6: ......
Страница 10: ...5 11 TROUBLESHOOTING 5 31 ...
Страница 11: ...SECTION 1 BASIC INFORMATION ...
Страница 24: ...PRONAR RC2100 2 SECTION 1 1 14 ...
Страница 25: ...SECTION 2 SAFETY ADVICE ...
Страница 40: ...Pronar RC2100 2 SECTION 2 2 16 FIGURE 2 3 Locations of information and warning decals ...
Страница 41: ...SECTION 3 DESIGN AND OPERATION ...
Страница 59: ...SECTION 4 CORRECT USE ...
Страница 78: ...Pronar RC2100 2 SECTION 4 4 20 ...
Страница 79: ...SECTION 5 MAINTENANCE ...
Страница 110: ...Pronar RC2100 2 SECTION 5 5 32 FIGURE 5 12 Lubrication points part 1 ...
Страница 111: ...SECTION 5 Pronar RC2100 2 5 33 FIGURE 5 13 Lubrication points part 2 ...
Страница 119: ...NOTES ...
Страница 120: ... ...
Страница 121: ...ANNEX A Tyre dimensions LP TYRES WHEEL RIM 1 215 75 R17 5 135 133 J 17 5x6 75 ...