
SECTION 5
Pronar RC2100-2
5.11
FIGURE 5.5
Sequence of nut tightening
(1) - (8) sequence of nut tightening, (L) spanner length, (F) user weight
Check the wheel nut tightening:
•
After the first use of trailer (one-time inspection).
•
Every 2 – 3 hours of trailer travel (during the first month of trailer use).
•
Every 30 hours of trailer travel.
The above actions should be repeated individually if a wheel has been removed from the
wheel axle.
TABLE 5.1
Spanner arm
WHEEL TIGHTENING TORQUE
BODY WEIGHT (F)
ARM LENGTH (L)
[Nm]
[kg]
[m]
86
0.45
77
0.50
70
0.55
380
65
0.60
Содержание RC2100-2
Страница 2: ......
Страница 6: ......
Страница 10: ...5 11 TROUBLESHOOTING 5 31 ...
Страница 11: ...SECTION 1 BASIC INFORMATION ...
Страница 24: ...PRONAR RC2100 2 SECTION 1 1 14 ...
Страница 25: ...SECTION 2 SAFETY ADVICE ...
Страница 40: ...Pronar RC2100 2 SECTION 2 2 16 FIGURE 2 3 Locations of information and warning decals ...
Страница 41: ...SECTION 3 DESIGN AND OPERATION ...
Страница 59: ...SECTION 4 CORRECT USE ...
Страница 78: ...Pronar RC2100 2 SECTION 4 4 20 ...
Страница 79: ...SECTION 5 MAINTENANCE ...
Страница 110: ...Pronar RC2100 2 SECTION 5 5 32 FIGURE 5 12 Lubrication points part 1 ...
Страница 111: ...SECTION 5 Pronar RC2100 2 5 33 FIGURE 5 13 Lubrication points part 2 ...
Страница 119: ...NOTES ...
Страница 120: ... ...
Страница 121: ...ANNEX A Tyre dimensions LP TYRES WHEEL RIM 1 215 75 R17 5 135 133 J 17 5x6 75 ...