Draft - 1 Aug 08
Monitoring during Leads Off
6-28
ECG Monitoring
Fallback for
EASI
If one of the derived EASI leads is in a technical alarm condition, a flat line is
displayed. After 10 seconds, the directly acquired EASI AI, AS, or ES lead,
depending on which is available, is displayed with the label “ECG”. Arrhythmia
relearn is performed with transition to or from EASI Fallback monitoring using
the available lead(s).
Relearning
Whenever there is a "Leads Off" condition, the arrhythmia algorithm performs a
Relearn using the available leads.
Warning
Warning
Since Relearn happens automatically, if learning takes place during
ventricular rhythm, the ectopics can be incorrectly learned as the normal
QRS complex. This can result in missed detection of subsequent events of
V-Tach and V-Fib. For this reason, you should:
1. Respond promptly to any technical alarm.
2. Ensure that the arrhythmia algorithm is labeling beats correctly.
Using EASI Leads to Troubleshoot
If there is artifact in the ECG waves or a "Cannot Analyze ECG" technical
alarm condition is in effect, you can use the three EASI leads to troubleshoot at
the Information Center:
1. Click
12-Lead ECG
on the Patient Window, then on
3 EASI Leads
.
2. The three directly acquired EASI leads will be displayed so that you can
determine which electrodes are causing the problem and need to be
replaced.
Содержание IntelliVue TRx
Страница 6: ...Draft 1 Aug 08 About this Book vi ...
Страница 40: ...Draft 1 Aug 08 Accessories 2 18 Product Safety ...
Страница 54: ...Draft 1 Aug 08 Audible Tones 3 14 Transceiver Controls ...
Страница 74: ...Draft 1 Aug 08 Battery Information 4 20 Basic Operation ...
Страница 94: ...Draft 1 Aug 08 Technical Alarms INOPs 5 20 Alarms ...
Страница 152: ...Draft 1 Aug 08 How the QT Analysis Algorithm Works 7 24 ST AR Arrhythmia Monitoring ...
Страница 176: ...Draft 1 Aug 08 Optimizing SpO2 Measurement Performance 8 24 SpO2 Monitoring ...
Страница 236: ...Draft 1 Aug 08 Troubleshooting 11 16 Maintenance Cleaning Troubleshooting ...
Страница 268: ...Draft 1 Aug 08 SpO2 Accessories A 10 Accessories ...
Страница 270: ...Draft 1 Aug 08 B 2 Sales and Support Offices ...
Страница 274: ...Draft 1 Aug 08 Index 4 ...