Maintenance
4-28
3160-A2-GB21-80
March 1999
5. From the DCLB screen, press the Function key for the port for which you
want to perform the data channel loopback. Use the scroll keys, if necessary.
F1
Loopback: DCLB
Prt1
Prt2
Prt3
F2
F3
Test Started
appears on Line 2. If a Data Channel loopback is already in
progress, the
Already Active
message appears. If an invalid combination
of loopbacks is in progress, the error message
Invld Test Combo
appears
(see
Table 4-8
for valid loopback test combinations).
Starting a Data Terminal Loopback
The Data Terminal Loopback command (DTLB) loops the data received from the
selected port, for all DS0 channels allocated to the port, back out of the port. This
loopback occurs after the data passes through the port circuitry but before it
reaches the T1 framer.
496-14314-02
CSU
DSU
NETWORK
INTERFACE
DTE
(DSX-1)
ALL 1s
DTLB
DTLB
PORT 1
PORT 2
Procedure
To perform a Data Terminal loopback:
1. From the top-level menu screen, select Test.
2. From the Test screen, select Lpbk.
F1
Test:
Rlpbk Lpbk
Ptrns
F2
F3
3. From the Loopback screen, press the
key until the DTLB selection
appears on the screen.
Содержание ACCULINK 3160
Страница 1: ...ACCULINK 3160 3161 3164 AND 3165 DSU CSU OPERATOR S GUIDE Document No 3160 A2 GB21 80 March 1999...
Страница 16: ...About This Guide x 3160 A2 GB21 80 March 1999 This page intentionally left blank...
Страница 24: ...Introduction 1 8 3160 A2 GB21 80 March 1999 This page intentionally left blank...
Страница 100: ...Operation 3 66 3160 A2 GB21 80 March 1999 This page intentionally left blank...
Страница 140: ...Maintenance 4 38 3160 A2 GB21 80 March 1999 This page intentionally left blank...
Страница 141: ...A 1 3160 A2 GB21 80 March 1999 Front Panel Menu A...
Страница 278: ...Asynchronous Terminal Operation H 24 3160 A2 GB21 80 March 1999 This page intentionally left blank...
Страница 280: ...Equipment List I 2 3160 A2 GB21 80 March 1999 This page intentionally left blank...