Operation
3-37
3160-A2-GB21-80
March 1999
6. From the Channel Config screen, select Dsply.
F1
Channel Config:
Dsply
Clear
DTE
F2
F3
7. From the Display Chan screen, select NET to display the channels allocated
to the network interface. Or, select DTE to display the channels allocated to
the DTE Drop/Insert (DSX-1) interface.
F1
Display Chan:
NET
DTE
Ports
F2
F3
8. If you selected NET the channels allocated to the network interface are
displayed. Line 1 displays the 24 channels for the network interface, while
Line 2 displays what is allocated to the DS0 channel shown in Line 1.
Pressing the
or
key scrolls the channels onto the screen in groups of
three.
F1
N1
N2
N3
D2
D3
Prt1
F2
F3
If you selected DTE, the channels allocated to the DTE Drop/Insert (DSX-1)
interface are displayed. Line 1 displays the 24 channels for the DTE
Drop/Insert (DSX-1) interface, while Line 2 displays what is allocated to the
DS0 channel shown in Line 1.
F1
D1
D2
D3
–
N1
N2
F2
F3
Содержание ACCULINK 3160
Страница 1: ...ACCULINK 3160 3161 3164 AND 3165 DSU CSU OPERATOR S GUIDE Document No 3160 A2 GB21 80 March 1999...
Страница 16: ...About This Guide x 3160 A2 GB21 80 March 1999 This page intentionally left blank...
Страница 24: ...Introduction 1 8 3160 A2 GB21 80 March 1999 This page intentionally left blank...
Страница 100: ...Operation 3 66 3160 A2 GB21 80 March 1999 This page intentionally left blank...
Страница 140: ...Maintenance 4 38 3160 A2 GB21 80 March 1999 This page intentionally left blank...
Страница 141: ...A 1 3160 A2 GB21 80 March 1999 Front Panel Menu A...
Страница 278: ...Asynchronous Terminal Operation H 24 3160 A2 GB21 80 March 1999 This page intentionally left blank...
Страница 280: ...Equipment List I 2 3160 A2 GB21 80 March 1999 This page intentionally left blank...