Index
IN-4
3160-A2-GB21-80
March 1999
status
Performance Report, 4-8
Self-Test Health, 2-9, 4-2
Test Status, 4-37– 4-38
MIBs, SNMP.
See SNMP, MIBs
modem, D
MODEM Port
acquiring/releasing the user interface, 3-51– 3-68
configuration option, C-24
functional description, 1-2, 1-7
physical description, 1-5, 1-6
pin assignments, D-4– D-16
technical specifications, B-2
used with ASCII terminal/printer, 4-11
used with SNMP system, 3-20
Mon (Monitor) branch, example of use, 4-17
N
NET (Network) Configuration branch
example of use, 3-16
option table, C-8– C-52
option worksheet, C-41
network interface
cabling example, 2-8
channel allocation procedure, 3-29– 3-68
configuration options, C-8
failure message, 4-2
front panel LED indications, 3-6
functional description, 1-7, 2-1
physical description, 1-5, 1-6
pin assignments, D-1– D-16
technical specifications, B-2
troubleshooting, 4-14
O
objects, SNMP, 1-3, E-1– E-32
OOF (Out Of Frame) condition
ASCII terminal/printer message, 4-11
Device Health and Status message, 4-4
front panel LED indication, 3-6, 3-7
Performance Report message, 4-8
troubleshooting, 4-14
options, strap.
See configuration options
P
pattern tests, 4-30– 4-38
payload loopback (PLB), 4-24– 4-38
PBX applications, 2-2
PDV (Pulse Density Violation) condition, 3-8
Perf (Performance Report) branch, example of use,
4-6– 4-38
performance reporting, 4-5– 4-38, C-7
physical description of DSU/CSU, 1-3– 1-5, B-2
pin assignments, D-1– D-16
Point-to-Point Protocol (PPP)
procedure for configuring, 3-23
used with SNMP system, 1-3, 2-3, 2-4, 3-20, F-1
PORT (1– 4) interface
channel allocation procedure, 3-29– 3-68
configuration options, C-3– C-52
failure message, 4-2
front panel LED indications, 3-8
functional description, 1-7, 2-1
managed by SNMP, E-1
physical description, 1-5, 1-6
pin assignments, D-8– D-16
technical specifications, B-2
Port Configuration branch
example of use, 3-18– 3-68
option table, C-3– C-52
option worksheet, C-44
power input
cabling example, 2-8
connector, 1-5, 1-6, 1-7, D-15– D-16
consumption, B-1
optional power sources, 2-5– 2-10, B-1, D-15–
D-16
requirement, B-1
troubleshooting, 4-14
power module, 1-7, B-1
power-up self-test
displaying results, 4-1– 4-38
front panel indications, 2-9, 3-6
troubleshooting, 4-14
problem determination.
See troubleshooting
protocol, link layer, 3-19, 3-23– 3-68
Ptrns (Test Patterns) branch, example of use, 4-30–
4-38
Содержание ACCULINK 3160
Страница 1: ...ACCULINK 3160 3161 3164 AND 3165 DSU CSU OPERATOR S GUIDE Document No 3160 A2 GB21 80 March 1999...
Страница 16: ...About This Guide x 3160 A2 GB21 80 March 1999 This page intentionally left blank...
Страница 24: ...Introduction 1 8 3160 A2 GB21 80 March 1999 This page intentionally left blank...
Страница 100: ...Operation 3 66 3160 A2 GB21 80 March 1999 This page intentionally left blank...
Страница 140: ...Maintenance 4 38 3160 A2 GB21 80 March 1999 This page intentionally left blank...
Страница 141: ...A 1 3160 A2 GB21 80 March 1999 Front Panel Menu A...
Страница 278: ...Asynchronous Terminal Operation H 24 3160 A2 GB21 80 March 1999 This page intentionally left blank...
Страница 280: ...Equipment List I 2 3160 A2 GB21 80 March 1999 This page intentionally left blank...