Sending a V.54/ANSI FT1 Activation/Deactivation
Procedure
To send a V.54 or ANSI FT1 Activation or Deactivation loopback sequence to the
far-end DSU/CSU:
1. From the top-level menu screen, select Test.
2. From the Test screen, select Rlpbk.
F1
Test:
Rlpbk Lpbk
Ptrns
F2
F3
3. From the Rem Loopback screen, press the function key that corresponds to
the specific loopback test you want to perform. Use the scroll keys, if
necessary.
F1
Rem Loopback:
LLBUP LLBDN 54UP
F2
F3
The Rem Loop screen appears.
F1
Rem Loop:
Type
Prt1
Prt2
Prt3
F2
F3
The 54UP, 54DN, FT1UP, and FT1DN commands send the requested
sequence out the network interface on the DS0 channels allocated to the port
you select here.
4. From the Rem Loop screen, press the desired function key to select the
specific port. Use the scroll keys, if necessary.
After you select a port, the sequence is sent to the far-end DSU/CSU. During
this time,
Sending
appears on Line 2 of the LCD, followed by
Command
Complete
when the sequence is complete.
During the
Sending
message, you can press the
and
keys without
affecting transmission of the loopback sequence.
Содержание ACCULINK 3160
Страница 1: ...ACCULINK 3160 3161 3164 AND 3165 DSU CSU OPERATOR S GUIDE Document No 3160 A2 GB21 80 March 1999...
Страница 16: ...About This Guide x 3160 A2 GB21 80 March 1999 This page intentionally left blank...
Страница 24: ...Introduction 1 8 3160 A2 GB21 80 March 1999 This page intentionally left blank...
Страница 100: ...Operation 3 66 3160 A2 GB21 80 March 1999 This page intentionally left blank...
Страница 140: ...Maintenance 4 38 3160 A2 GB21 80 March 1999 This page intentionally left blank...
Страница 141: ...A 1 3160 A2 GB21 80 March 1999 Front Panel Menu A...
Страница 278: ...Asynchronous Terminal Operation H 24 3160 A2 GB21 80 March 1999 This page intentionally left blank...
Страница 280: ...Equipment List I 2 3160 A2 GB21 80 March 1999 This page intentionally left blank...