4-1
3160-A2-GB21-80
March 1999
Maintenance
4
Overview
The DSU/CSU can detect and report faults, and perform diagnostic tests. These
features ensure that your DSU/CSU is giving you optimum performance in your
network.
Self-Test Health
Use the Self-Test Health command to display the results of the power-up self-test.
Possible messages are listed in
Table 4-1
. See Chapter 2,
Installation
, for more
information about power-up self-test.
Procedure
To display power-up self-test results:
1. From the top-level menu screen, select Stat.
F1
DSU ESF
Stat
Test
Cnfig
F2
F3
2. From the Status screen, select STest.
F1
Status:
DevHS STest
Perf
F2
F3
Содержание ACCULINK 3160
Страница 1: ...ACCULINK 3160 3161 3164 AND 3165 DSU CSU OPERATOR S GUIDE Document No 3160 A2 GB21 80 March 1999...
Страница 16: ...About This Guide x 3160 A2 GB21 80 March 1999 This page intentionally left blank...
Страница 24: ...Introduction 1 8 3160 A2 GB21 80 March 1999 This page intentionally left blank...
Страница 100: ...Operation 3 66 3160 A2 GB21 80 March 1999 This page intentionally left blank...
Страница 140: ...Maintenance 4 38 3160 A2 GB21 80 March 1999 This page intentionally left blank...
Страница 141: ...A 1 3160 A2 GB21 80 March 1999 Front Panel Menu A...
Страница 278: ...Asynchronous Terminal Operation H 24 3160 A2 GB21 80 March 1999 This page intentionally left blank...
Страница 280: ...Equipment List I 2 3160 A2 GB21 80 March 1999 This page intentionally left blank...