Maintenance
4-35
3160-A2-GB21-80
March 1999
5. From the Abort screen, press the Function key that corresponds to the
network or port for which you want to abort a test pattern. Use the scroll keys,
if necessary.
F1
Abort:
Send or Mon
NET
Prt1
Prt2
F2
F3
The DSU/CSU terminates the selected test pattern and displays the message
Command Complete
.
Lamp Test
Use the Lamp Test commands to start and stop a test of the DSU/CSU front
panel LCD and LEDs.
Starting a Lamp Test
Procedure
To start a Lamp test:
1. From the top-level menu screen, select Test.
2. From the Test screen, press the
key until the Lamp selection appears on
the screen.
3. From the Test screen, select Lamp.
F1
Test:
Lpbk
Ptrns
Lamp
F2
F3
4. From the Lamp Test screen, select Start.
F1
Lamp Test:
Abort
Start
F2
F3
Содержание ACCULINK 3160
Страница 1: ...ACCULINK 3160 3161 3164 AND 3165 DSU CSU OPERATOR S GUIDE Document No 3160 A2 GB21 80 March 1999...
Страница 16: ...About This Guide x 3160 A2 GB21 80 March 1999 This page intentionally left blank...
Страница 24: ...Introduction 1 8 3160 A2 GB21 80 March 1999 This page intentionally left blank...
Страница 100: ...Operation 3 66 3160 A2 GB21 80 March 1999 This page intentionally left blank...
Страница 140: ...Maintenance 4 38 3160 A2 GB21 80 March 1999 This page intentionally left blank...
Страница 141: ...A 1 3160 A2 GB21 80 March 1999 Front Panel Menu A...
Страница 278: ...Asynchronous Terminal Operation H 24 3160 A2 GB21 80 March 1999 This page intentionally left blank...
Страница 280: ...Equipment List I 2 3160 A2 GB21 80 March 1999 This page intentionally left blank...