Maintenance
4-29
3160-A2-GB21-80
March 1999
4. Select DTLB.
F1
Loopback:
RLB
DCLB
DTLB
F2
F3
5. From the DTLB screen, press the Function key for the port for which you
want to perform the data terminal loopback. Use the scroll keys, if necessary.
F1
Loopback: DTLB
Prt1
Prt2
Prt3
F2
F3
Test Started
appears on Line 2. If a Data Terminal loopback is already in
progress, the
Already Active
message appears. If an invalid combination
of loopbacks is in progress, the error message
Invld Test Combo
appears
(see
Table 4-8
for valid loopback test combinations).
Aborting Loopbacks
The Abort Loopback command stops all loopback tests or any selected loopback
test currently active on the DSU/CSU.
Procedure
To abort one or more loopback tests:
1. From the top-level menu screen, select Test.
2. From the Test screen, select Lpbk.
F1
Test:
Rlpbk Lpbk
Ptrns
F2
F3
3. From the Loopback screen, select Abort.
F1
Loopback:
Abort
LLB
PLB
F2
F3
Содержание ACCULINK 3160
Страница 1: ...ACCULINK 3160 3161 3164 AND 3165 DSU CSU OPERATOR S GUIDE Document No 3160 A2 GB21 80 March 1999...
Страница 16: ...About This Guide x 3160 A2 GB21 80 March 1999 This page intentionally left blank...
Страница 24: ...Introduction 1 8 3160 A2 GB21 80 March 1999 This page intentionally left blank...
Страница 100: ...Operation 3 66 3160 A2 GB21 80 March 1999 This page intentionally left blank...
Страница 140: ...Maintenance 4 38 3160 A2 GB21 80 March 1999 This page intentionally left blank...
Страница 141: ...A 1 3160 A2 GB21 80 March 1999 Front Panel Menu A...
Страница 278: ...Asynchronous Terminal Operation H 24 3160 A2 GB21 80 March 1999 This page intentionally left blank...
Страница 280: ...Equipment List I 2 3160 A2 GB21 80 March 1999 This page intentionally left blank...