2-1
3160-A2-GB21-80
March 1999
Installation
2
Overview
This chapter contains information for installing your standalone DSU/CSU. It
includes application examples, cabling, and power-up information.
NOTE:
Installation instructions for the carrier-mounted DSU/CSU are located in the
ACCULINK 3151 CSU and 3161 DSU/CSU General Information Guide
and
the
COMSPHERE 3000 Series Carrier Installation Manual.
Application Examples
The DSU/CSU acts as an interface between the T1 digital network and the
customer’s equipment.
The DSU/CSU is connected to the customer’s equipment through one of the
synchronous data ports (PORTs 1– 4) or the DTE Drop/Insert (DSX-1) interface. It
is connected to the T1 digital network through the network interface.
NOTE:
The DTE Drop/Insert (DSX-1) interface is only available on 2-port and 4-port
DSU/CSUs.
Some common applications for the DSU/CSU are:
Point-to-Point LAN interconnection (
Figure 2-1
).
Shared access to network-based services (
Figure 2-2
).
Fractional T1 network applications (
Figure 2-3
).
Содержание ACCULINK 3160
Страница 1: ...ACCULINK 3160 3161 3164 AND 3165 DSU CSU OPERATOR S GUIDE Document No 3160 A2 GB21 80 March 1999...
Страница 16: ...About This Guide x 3160 A2 GB21 80 March 1999 This page intentionally left blank...
Страница 24: ...Introduction 1 8 3160 A2 GB21 80 March 1999 This page intentionally left blank...
Страница 100: ...Operation 3 66 3160 A2 GB21 80 March 1999 This page intentionally left blank...
Страница 140: ...Maintenance 4 38 3160 A2 GB21 80 March 1999 This page intentionally left blank...
Страница 141: ...A 1 3160 A2 GB21 80 March 1999 Front Panel Menu A...
Страница 278: ...Asynchronous Terminal Operation H 24 3160 A2 GB21 80 March 1999 This page intentionally left blank...
Страница 280: ...Equipment List I 2 3160 A2 GB21 80 March 1999 This page intentionally left blank...