IG-308-EN version 01; 03/06/2022
62
Recommended sequence of operations
General instructions
cgm
.3-huv system: Fully gas-insulated
medium-voltage switchgear
3.
Insert the lever in the S1 earthing actuating shaft, move
the actuating arm to the end and turn anti-clockwise.
Figure 5.63.
Lever turn detail
Earthing operation
Initial conditions: circuit-breaker closed and earthing switch
S1 and S2 open.
1.
Open the circuit-breaker by pressing the "O" button on
the front keypad and check the status indicating relay.
Figure 5.64.
Opening button detail
Содержание velatia cgm.3 system
Страница 75: ......